Customization and Postinstallation Steps for CA Ideal for CA Datacom

This section describes the minimum configuration tasks that are required before idcm can be started, customized, and used in your environment.
cadts150
This section describes the minimum configuration tasks that are required before
CA Ideal™ for CA Datacom®
can be started, customized, and used in your environment.
 Execute sample jobs in sequential order by name and number. Review, edit, execute, and complete each installation step before proceeding to the next step.
Follow these guidelines when installing: 
  1. Customization Phase
    Before performing either a new install or an upgrade, execute the members that have names that start with ILCUS.
  2. New Installation Phase
    If you are installing 
    CA Ideal™ for CA Datacom®
     for the first time, execute members whose names start with ILNEW. After all ILNEW jobs execute successfully, the CA Ideal product environment is ready for use.
  3. CA Ideal™ for DB2
    Installation Phase
    If you are installing the
    CA Ideal™ for DB2
    , execute members whose names start with
     IOINS
     and all previously mentioned jobs. After all 
    IOINS
     jobs execute successfully, the
    CA Ideal™ for DB2
    for DB2 environment is complete.
  4. Verification Phase
    Execute the members whose names start with
     ILVER
    . After all 
    ILVER
     jobs execute successfully, the 
    CA Ideal™ for CA Datacom®
     components are successfully installed and verified. If you are upgrading from an earlier release, apply any additional table entries or option table changes now.
INSTJCL Member Names
The INSTJCL member names can be easily identified during any installation. These names are constructed as follows:
  • The first two characters relate to the component being installed:
    Each name begins with
    IL
    to identify
    CA Ideal™ for CA Datacom®
    - the base product.
    Each name begins with
    IO
    to identify
    CA Ideal™ for DB2
    - applicable only if you have this option.
  • The next three characters identify the type of installation step:
    • CUS
      Indicates a customization job that is performed for all mew or upgrade installations.
    • INS
      Indicates a new or upgrade installation step that is performed
      CA Ideal™ for DB2
      .
    • NEW
      Indicates a step for new installations of the
      CA Ideal™ for CA Datacom®
      environment.
    • VER
      Indicates an installation verification step.
  • The remainder of each name indicates the number of the step and can include a suffix.
    If the suffix is
    X
    , the step is
    optional
    for the overall installation. You might not need to perform this step. Read the step description to determine whether to include it in your
    CA Ideal™ for CA Datacom®
    installation. If this step is required, run these jobs after the same job number without the X suffix.