CAP Inserting Capacity Planning File Definitions

Use the Reports and Graphics Jobstream screen to either "Specify MICF Inquiries for Reporting Jobstream" or "Specify Capacity Planning Files to Update".
micsrm140cd
For new jobstreams, this option always displays the first of these two messages. For jobstreams that have been previously defined, this option displays whichever of these two statements is appropriate for the contents of the jobstream. If, when you are initially building the jobstream, you answer Y to this option, you will next see the Reports and Graphics Jobstream screen shown in the following figure.
Figure 1-28 Reports and Graphics Jobstream Screen
/--------------------- Reports and Graphics Jobstream -----------------------\ |Command ===> | |Select the type of reporting jobstream being defined or press END to cancel. | | | | | | 1 - Select Shared MICF Inquiries | | Select the shared MICF data base inquiries to be included in the | | reporting jobstream. | | 2 - Select Shared Capacity Planning File Definitions | | Select the shared capacity planning files to be updated by the | | production jobstream. | | | | | | | | | | | | | | | | | | | | | | | | | --------------------------------------------------------------------------------
The second option on this screen, the one for selecting shared capacity planning file definitions, permits you to insert one or more shared capacity planning file processes into a production reporting jobstream. Once you choose one of the options on this screen, the entire jobstream you are defining will consist of either shared MICF inquiries or shared capacity planning file definitions.
The following description shows you the sequence of actions you need to take to add a shared capacity file definition to a production reporting jobstream. Use a series of three screens (as shown in Figures 1-29, 1-30, and 1-31) to manage the content of these jobstreams:
Figure 1-29 Capacity Planning File Definitions Screen
/--------------------- Capacity Planning File Definitions -------------------\ |Command ===> Scroll ===> CSR | | | |Reporting Jobstream: CAP001 - CAP UPDATE 001 | | | | Catalog Group ===> CAPACITY| | File Name ===> __ | | | |Line Cmds: I Insert D Delete S Select M Move | | | |Cmd Name Title Cycles Periods | | - -------- ---------------------------------------- ------- --- | | _ CPU CPU STD APPL -- Weeks | | _ WK0 WKL STD APPL -- Weeks | |****************************** BOTTOM OF DATA *******************************| | | | | | | | | | | | | | | | | | | --------------------------------------------------------------------------------
This screen shows the capacity planning database file updates you currently have included in the production reporting jobstream and permits you to delete any of these file updates from the jobstream, rearrange the sequence of these entries, or add new file update entries. When you run the jobstream containing these capacity file update processes shown on this screen, the files will be updated in the same sequence that they are listed on this screen.
Specify D in the Cmd column to delete a capacity file update from the jobstream.
Specify M in this same column to move a capacity file update to before or after another update in the list. Specify B or A to indicate the position before or after which you want to move the capacity file update.
Specify I in the Cmd column to insert another shared capacity file update in the jobstream. If you do this, you will see the next screen in the sequence, the Shared File Definition Selection screen shown in Figure 1-30.
Figure 1-30  Shared File Definition Selection Screen
/---------------------- Shared File Definition Selection --------------------\ |Command ===> Scroll ===> CSR | | | |Reporting Jobstream: CAP001 - CAP UPDATE 001 | | | | Catalog Group ===> * | | File Name ===> __ | | | |Line Cmds: S Select | | | |Cmd Name Title Type Status | | - -------- ---------------------------------------- - -----------------| | s CI0 CICS - Weeks S Initial 98/05/04| | _ CPU CPU STD APPL -- Weeks S Initial 98/04/30| | _ CP0 CPU STD APPL -- Months S Initial 98/04/30| | _ WK0 WKL STD APPL -- Weeks S Initial 97/07/11| |****************************** BOTTOM OF DATA *******************************| | | | | | | | | | | | | --------------------------------------------------------------------------------
This screen displays the shared file definitions available for insertion in the jobstream. You can select one or more of these shared capacity file definitions into the jobstream by entering an S in the Cmd column. If you do so, you will next see the Select Shared File Definition screen shown in Figure 1-31.
Figure 1-31 Select Shared File Definition Screen
/---------------------- Select Shared File Definition -----------------------\ |Command ===> | |Enter a ? in any data entry field for more information on valid values. | |Reporting Jobstream: CAP001 - CAP UPDATE 001 | | | | | | File Name: CI0 | | Title: CICS - Weeks | | Author:
Broadcom
| | | | | |Catalog Group Name ===> CAPACITY | | Title ===> Capacity Planning | | | | | |Default Cycle(s) ===> __ - __ (00-99) | | No. Weeks ===> ___ (1-999) | | | | | |Press END to add the file definition to the reporting jobstream. | |or | |Enter CANCEL to return to the catalog display without adding the file. | | | --------------------------------------------------------------------------------
The Select Shared File Definition screen is displayed in response to any S you enter on the preceding screen. This screen displays the shared file definition selected on the previous screen and allows you to specify a new catalog group and override the
MICS
cycles or number of weeks or months for the update process. The update process for the capacity planning file that is described by this screen will be entered into the production job stream.