Using external data to contribute to the CCS asset Risk Score

Perform the following procedure to use external data to contribute to the CCS asset Risk Score.
  1. To use external data to contribute to the CCS asset Risk Score
  2. Add the external data system.
  3. Import the external data using the data connectors.
  4. Run the import job.